Production Planning

Draft production orders, material checks and release to production

Draft Production Orders

Preparing work before it reaches production

Why Use a Draft?

A draft lets planners prepare product, recipe, quantity, priority, machine and target dates without immediately starting production. It provides a controlled point for review and material reservation.

Release to Production

After validation, the draft is released to production and becomes visible to authorized operators. The released order retains its recipe, reservation and reference links.

Recipe and Material Check

Availability, priority and schedule controls

Missing-material Warning

Planning compares recipe requirements with available inventory. Shortages are shown to the planner; they do not automatically create purchase requests today.

Priority and Calendar

Priority and planned dates help sequence draft orders. Advanced capacity-conflict detection and automatic due-date optimization are planned rather than current capabilities.